Bridge Waterway Studies, Hume Highway, Gundagai. December 1963.

Download files
Access & Terms of Use
open access
Altmetric
Abstract
Defines the limit of embankment for proposed highway bridge crossing over river flood plain. Various lengths of embankment and heights under range of flood conditions. Embankment caused very little rise in flood stage until it penetrated a strong current which traversed the flood plain. Exact estimates of length, height and stage are given.
Persistent link to this record
Link to Publisher Version
Link to Open Access Version
Additional Link
Author(s)
Ewers, J. R.
Foster, D. N.
Supervisor(s)
Creator(s)
Editor(s)
Translator(s)
Curator(s)
Designer(s)
Arranger(s)
Composer(s)
Recordist(s)
Conference Proceedings Editor(s)
Other Contributor(s)
Corporate/Industry Contributor(s)
Publication Year
1963
Resource Type
Report
Degree Type
UNSW Faculty
Files
download WRL_Research_Report_069.pdf 25.18 MB Adobe Portable Document Format
Related dataset(s)